BP — Sakkis Jabulani
Johannesburg, Gauteng
BP’s Sakkis Jabulani facility required maximum-security Clear-View fencing to protect critical petroleum infrastructure while maintaining operational visibility for site personnel.
Project Scope
Installation of 1,800+ linear meters of High Security Clear-View mesh across the perimeter of a major distribution facility. The project included precise measurements around existing infrastructure, loading bays, and operational zones.
Key Requirements
- Critical Infrastructure: Petroleum facility security standards
- Anti-Cut & Anti-Climb: Dense grid pattern (16×11 bars)
- Professional Finish: Galvanized and powder-coated steel
- Minimal Downtime: Installation coordinated during non-operational hours
Solution Delivered
Our High Security range with premium galvanized finish provides:
- Maximum Durability: Built to withstand harsh industrial environment
- Complete Sightlines: Full visibility for security monitoring
- Professional Installation: In-house team ensuring precision
- Lifetime Design Warranty: Premium specification backed by our guarantee
The result: A robust security perimeter protecting one of South Africa’s critical energy assets.
Planning something similar?
Tell us about your site and we'll recommend the right Clear-View specification.
Get a Quote